|
Unfold the
sling on the ground or on a guide pallet |
| |
|

|
|

|
|
First |
|
Second |
| |
 |
| |
|
Begin to place
the bags on the sling ensuring that they lie close
together and centrally over the base of slings |
| |
|

|
|

|
|
Third |
|
Fourth |
| |
 |
| |
|
Each time a
layer is built, rotate the pattern of stacking by 180
degrees. This helps the unit to bind together. |
| |
|

|
|

|
|
Fifth |
|
Sixth |
| |
 |
| |
|
Fasten the
narrow lashing straps diagonally across the top of the
unit. |
| |
|
|
|

|

|

|
|
Seven |
Eight |
Nine |
| |
 |
| |
|
With the unit
lifted just of the ground, tighten the lashings again. |
| |
|
|
| |

|
|
| |
Tenth |
|
| |
 |
| |
|
For extra
lifting height, invert the forks of the truck. |
| |
|
|
| |

|
|
| |
Eleven |
|